Public Notice
Drone Operation | April 3, 2025
Home » Drone Operation | April 3, 2025
Published:
- April 2, 2025
News Category:
- Public Notice
Post Views:
- 672
Drone Operation | April 3, 2025
When: Thursday, April 3, 2025
Time: 7:00 AM – 10:00 AM
Bird One (Seabird Island’s drone) will be capturing footage of the following locations:
- Chief Hali Farm
- AE Concrete site,
- Pipeho:m Rd. construction.
These flights are being conducted to capture each project’s progress and different perspectives along the way. The flights are strictly for the current projects and existing buildings within Seabird Island.
Please do not approach the drone pilot if the drone is in the air, the pilot does their best to fly at a minimum 30 meters away from bystanders at all times.
If there are any questions or concerns regarding the drone flights, please do not hesitate to contact Kailie McRae at 604-796-6932.